Skip to content

The Canzeno shower system

A complete approach to custom shower construction

From custom prefabricated tiled shower bases to shower niches, waterproof building boards, drains and accessories, Canzeno brings together the essential components for a better shower installation.

Installed Canzeno tiled shower base with a linear drain and the CANZENO label on its edge

Prefabricated tiled shower bases

One base, four drains

Every model is the same layered, waterproof base. Choose the drain that suits your floor and your tile, and where it sits in the shower.

See the shower bases

How it’s built

Five layers, finished in our shop

Built and checked in our shop, so the slope, the waterproofing and the drain are right before anything reaches your home.

  1. 5Integrated perimeter flangeLaps under the wall waterproofing so the edges stay sealed, around an integrated drain.
  2. 4Waterproof XPS foam backerA high-density XPS foam base that keeps the system light and dry.
  3. 3High-density structural coreCarries the load and holds the slope without a mortar bed.
  4. 2Composite reinforcementThe main waterproof layer: a reinforced composite skin under the tile.
  5. 1Non-slip, large-format tileThe tile you choose, cut and sloped to the drain in our shop.

How it works

From our shop to your shower

  1. 1Measure & designWe measure your bathroom and mark the centre lines. You choose the drain, where it sits and your tile.
  2. 2Built in our shopThe base is sloped, waterproofed in layers and finished in your tile before it leaves the shop.
  3. 3Packed & deliveredIt travels crated and protected, and arrives exactly as it left the shop.
  4. 4Ready to installIt goes in pre-tiled, with no mud bed and no curing wait, so there is far less time and mess on site.
  5. 5Walls, niche, glassWalls, niche and glass go in around the finished base. A tub to shower job takes 3–4 days, a full bathroom 7–9.
Book your in-home visit
A Canzeno shower system packed in a wooden crate with a red ribbon, delivered to a customer’s home
Crated and delivered
Install day: a Canzeno shower base going into a bathroom stripped to the studs
Install day

Portfolio · Real Canzeno projects

Canzeno showers, start to finish

Glass shower on a Canzeno base, freestanding tub

The slope test

Every drop finds the drain

The slope is built into the base in our shop, not floated by hand on site. Roll a ball anywhere on a finished Canzeno base and it runs straight to the drain, so water never sits on the floor.

For contractors & partners

Use Canzeno shower systems in your projects

Renovation contractors and kitchen & bath companies: talk to us about adding a shop-built tiled shower base to the jobs you already do.

For professionals

FAQ

Shower system questions

Still have a question? Ask us

Free estimate

Get a free estimate

Tell us about your bathroom. We’ll call you back to book an in-home visit, where we measure, show you the system and give you a price.

  1. 1We call you back to book a time
  2. 2In-home visit: we measure and show you the system
  3. 3You get a clear price, with no obligation
(416) 877-6467
Your project

Find us

Based in Richmond Hill, working across the GTA

Based in
Richmond Hill, Ontario
Hours
Mon–Sun 8 am–8 pm

Service area

  • Richmond Hill
  • Markham
  • Vaughan
  • Thornhill
  • Aurora
  • Newmarket
  • North York
  • Toronto
Based in Richmond Hill150 km service areaOpen in Google Maps ↗